Replace a monolith piece by piece: put a routing facade in front of it, move one capability at a time to a new service, shift traffic gradually — and keep rollback one switch away.

Intermediate 4 min read· Updated 2026-11-18

What you will learn

  • Plan a migration as a sequence of small, reversible steps.
  • Use a routing facade to shift traffic per route and per percentage.
  • Limit the blast radius of a buggy new service with canary releases.
  • Handle data during a migration (shared database, sync, ownership transfer).

Before you start

Overview

A strangler fig grows around an old tree, one branch at a time, until it can stand on its own and the old tree is gone. Rebuilding a large system works best the same way: grow the new one around the old one, function by function, while the business keeps running.

A routing facade (API gateway or reverse proxy) sits in front of the monolith. For each capability you rebuild, you add a route that sends some or all of its traffic to the new service. The monolith shrinks until nothing routes to it anymore.

Why not rewrite everything at once?

  • A big-bang rewrite delivers no value until the very end — often years later.
  • The old system keeps changing while the rewrite chases it.
  • Cut-over day concentrates all risk in one moment with no easy way back.

Run it

A: a buggy Orders v2 gets 10% of /orders — only a sliver of users notice; drag the slider to 100% to see a big-bang failure. B: a healthy v2 takes over in steps while /catalog stays on the monolith. C: a bug appears at 50%; flipping the route back stops the errors immediately.

Loading simulation…

A migration step by step

  1. Put the facade in front of the monolith with routes that all point to it (no behaviour change).
  2. Pick a capability with clear boundaries and real value (e.g. order history).
  3. Build the new service; keep it reading the same data at first, or sync data via events / CDC.
  4. Shadow traffic or compare results, then canary 1% → 10% → 50% → 100% while watching errors and latency.
  5. Move data ownership to the new service; remove the code path from the monolith.
  6. Repeat — and decommission the monolith when nothing routes to it.

Implementation: weighted routes

Spring Cloud Gateway (routing facade)
spring:
  cloud:
    gateway:
      server:
        webflux:
          routes:
            - id: orders-v2
              uri: lb://orders-v2
              predicates:
                - Path=/orders/**
                - Weight=orders, 10     # 10% of /orders
            - id: orders-legacy
              uri: lb://monolith
              predicates:
                - Path=/orders/**
                - Weight=orders, 90
            - id: everything-else
              uri: lb://monolith
              predicates:
                - Path=/**

Advanced Random percentages give each request a different backend; for flows with state (multi-step checkout) route sticky by user or tenant id instead, so one customer stays on one side. The hardest part is data: during the transition either both sides share the old database (simple, but coupled), or the new service owns a copy synced through events/CDC with one clear owner per field, never two writers.

Trade-offs

BenefitsCosts
RiskSmall, reversible steps; bugs reach a fraction of users.Two systems run in parallel for a long time.
DeliveryValue ships with every migrated capability.The facade and data sync are extra work that is thrown away at the end.
ConsistencyBehaviour can be compared side by side.Shared or synced data during the transition is a source of subtle bugs.

Production considerations

  • Compare error rate and latency per backend for the same route during every traffic shift.
  • Automate rollback (route weights in config, not code) and rehearse it.
  • Track what remains in the monolith; a migration that stalls at 80% doubles operating costs forever.